Returns the number of working days between the start and end dates, excluding holidays.
Excel: NETWORKDAYS
View version details
Contents  |
|
Interface
#include <codecogs/units/date/networkdays.h>
using namespace Units::Date;
| int | networkDays (int startDate, int endDate, int holidays=0, int* holidayDates=NULL) Returns the number of working days between the start and end dates, excluding holidays.
Excel: NETWORKDAYS |
Function Documentation
Calculates the number of work days between
startDate and
endDate, excluding all holidays listed. A workday is Monday to Friday (inclusive), so weekends are ignored. holidays arising over a weekend are also ignored.
A simple solution to this problem is to iterate through each day counting all valid dates. For example:
int days=0;
for(;startDate < endDate;startDate++)
{
int h;
for(h=0;h<holidays && holidayDates[h]!=startDate;h++); // check against holiday list
if(h==holidays && dayOfWeek(startDate)<5) days++; // only increment if not a holiday or weekend
}
Sadly we don't like this method because the time taken scales linearly with duration between dates. Moreover we have to check all the holidays against every date - an

process. Our approach uses a constant time method along the following lines:
where

is first Monday after
endDate and

is the first Monday before startDate; with
e and
s being the adjustments made to the end and start dates, respectively.
Example 1:
#include <stdio.h>
#include <codecogs/units/date/networkdays.h>
#include <codecogs/units/date/eastersunday.h>
#include <codecogs/units/date/nextweekday.h>
#include <codecogs/units/date/date.h>
#include <codecogs/units/date/dateymd.h>
using namespace Units::Date;
int main()
{
// The major holidays in the Christian World
int holidays[7];
holidays[0]=date(2005, 1, 1); // New years day
holidays[1]=easterSunday(2005)-2; // Good Friday
holidays[2]=easterSunday(2005); // Easter - should be ignored in calculations
holidays[3]=easterSunday(2005)+1; // Easter Monday
holidays[4]=nextWeekDay(date(2005, 5, 1)-1); // May day holiday (first weekday after the 1st - usually)
holidays[5]=date(2004,12,25); // Christmas day
holidays[6]=nextWeekDay(holidays[5]); // Boxing day or first weekday after Christmas
printf("\n startDate endDate NetworkDays");
int startdate=date("23 oct 2004");
int enddate=date("16 mar 2005");
for(int i=0;i<200;i+=10)
{
int d,m,y;
dateYMD(startdate+i,y,m,d);
printf("\n %2d-%2d-%d",d,m,y);
dateYMD(enddate,y,m,d);
printf(" %2d-%2d-%d",d,m,y);
printf(" %d", networkDays(startdate+i, enddate, 7, holidays));
}
return 0;
}
Output:
startDate endDate NetworkDays
23-10-2004 16- 3-2005 102
2-11-2004 16- 3-2005 96
12-11-2004 16- 3-2005 88
22-11-2004 16- 3-2005 82
2-12-2004 16- 3-2005 74
12-12-2004 16- 3-2005 67
22-12-2004 16- 3-2005 60
1- 1-2005 16- 3-2005 53
11- 1-2005 16- 3-2005 47
21- 1-2005 16- 3-2005 39
31- 1-2005 16- 3-2005 33
10- 2-2005 16- 3-2005 25
20- 2-2005 16- 3-2005 18
2- 3-2005 16- 3-2005 11
12- 3-2005 16- 3-2005 3
22- 3-2005 16- 3-2005 -5
1- 4-2005 16- 3-2005 -11
11- 4-2005 16- 3-2005 -17
21- 4-2005 16- 3-2005 -25
1- 5-2005 16- 3-2005 -31
Parameters:
| startDate | and... |
| endDate | are serial Julian dates (see date). The return value is signed, so if startDate occurs before endDate then a negative answer will be returned. See date, for details on creating these numbers. |
| holidays | is the number of holidays listed for exclusion, i.e. days that don't count as network days. holidays should match the size of the array passed in holidayDates. If holidayDates is left as NULL, then the number holidays will be deducted from the number of network days (a negative number of days is not allowed); n.b. This is not standard behaviour in Excel. |
| holidayDates | is a vector of holiday dates, indexed from 0 to holidays-1. If this array is left pointing to NULL (default), then the number of holidays will be 0 holidays. |
Authors:
- Will Bateman (Sep 2004)